Hide Cables by Chasing Brick Walls (Mortar Chasers)
To conceal wiring in a brick wall, have the wall assessed, get approval for the chase, and install a wiring method listed for the location. A mortar joint is not automatically safe to cut. Keep raceway within the approved route, size it for conductor fill, and leave every junction box accessible. Confirm permits and inspection rules locally.
A clean wall can make a mounted TV or sound system feel fully integrated, and neat, documented work may help when you sell your home. But no cable treatment guarantees a higher resale price. A poorly planned chase can leave visible cracks, damage masonry, or create wiring that is costly to repair. The best result is tidy, safe, and supported by approvals and records.
I’ve seen homeowners focus first on the mortar line because it looks like a natural route. That can be misleading: mortar joints are part of the wall system, and deep or continuous cuts can weaken masonry. The right route depends on the wall, its loads, any reinforcement, and the wiring method. Start with the wall, not the tool.
Planning: Wall Survey, Permits, and Structural Approval
A chase is a narrow channel cut into a wall to hold a raceway, which is a protective pathway for conductors. Before any cutting, identify the wall’s construction and structural role, check for hidden services, and obtain written structural approval for the proposed route and limits. There is no universal safe chase width or depth.
The governing rules are the locally adopted electrical code and the applicable masonry standards, such as TMS 402/602 where adopted, plus the structural design for the building. The NEC is a model code; your local jurisdiction may use a different edition or amendments. Ask the building department which permits and inspections apply before work begins.
Survey the wall before choosing a route
Confirm whether the wall is load-bearing, exterior, reinforced, or part of a fire-rated assembly. Check both sides of the wall, including the room or space above and below where possible. Look for outlets, switches, plumbing, heating pipes, and existing wiring. Use suitable detection tools, but do not treat a scanner reading as proof that the route is clear.
A structural engineer should review the proposed chase and the wall conditions. The engineer’s written limits should state where and how much material may be removed. Do not infer a safe depth from the thickness of a mortar joint, and do not assume that a short cut is harmless. Opposing chases, long channels, and cuts near openings can raise risk.
- Confirm the wall type and structural role.
- Locate utilities and inspect both sides.
- Get written approval before cutting.
- Check permit and inspection requirements with the authority having jurisdiction.
Access and Clearances: Raceway Route, Fill, and Box Access
A planned route must fit the approved chase while allowing the raceway, fittings, bends, and boxes to be installed and serviced. Raceway fill limits how many conductors can occupy a raceway. Boxes must remain accessible after finishing. Plan the full path before cutting so you do not have to deepen or extend the chase later.
Use a raceway and fittings listed for the installation conditions. The electrical professional should account for moisture, corrosion, physical protection, conductor type, bend count, and pull access. A wall that is exposed to weather or damp conditions may need different materials than a dry interior wall. Do not assume that any metal or plastic tube is suitable.
Size the raceway and plan box locations
As a U.S. model-code baseline, NEC Chapter 9, Table 1 sets maximum raceway fill at 53% for one conductor, 31% for two, and 40% for more than two. These are not a shortcut for sizing: use the applicable raceway and conductor tables and account for the actual conductor types and installation. Confirm the adopted NEC edition and local amendments.
NEC 300.3(A) generally requires conductors of the same circuit to be contained in the same raceway, cable, or permitted grouping. That does not mean power wiring and low-voltage signal cables should share a raceway. Separation rules apply; plan separate pathways unless the installation uses a permitted method.
NEC 314.29 requires outlet and junction boxes to remain accessible without removing building structure or finish. Do not bury a splice box behind plaster or mortar. Place boxes where a cover can be reached, and plan cable pulls so conductors can be installed without excessive force or damage.
| Planning item | What to check | Why it matters |
|---|---|---|
| Chase envelope | Engineer-approved route and depth | Prevents unauthorized masonry removal |
| Raceway fill | Applicable conductor and raceway tables | Avoids overcrowding and difficult pulls |
| Boxes | Accessible after the finish is complete | Allows inspection, service, and repair |
| Circuit grouping | NEC 300.3(A) and applicable rules | Keeps circuit conductors properly grouped |
| Raceway support | Raceway type and code section | Prevents loose or unsupported installation |
Execution: Controlled Chasing and Raceway Installation
Chasing means removing a limited strip of masonry to create a route for a raceway. It is not simply cutting a groove along a mortar joint. Follow the engineer-approved plan exactly, use suitable dust and eye protection, and stop if the wall differs from the conditions that were assessed. Cutting brick or reinforcement requires specific approval.
Do not bury ordinary cable directly in the chase or rely on mortar as its protection. Use a wiring method listed for the location and installation. Also, never conceal a flexible appliance cord or extension cord inside a wall. If a TV needs power, have a compliant receptacle or other approved wiring method installed rather than hiding its power cord.
Cut only the approved route
Before work, mark the approved chase and box locations. Confirm the route against the utility survey and check the other side of the wall again. Masonry cutting creates silica-containing dust; use controls and protective equipment suited to the work. Follow tool and material instructions, and keep dust out of occupied areas.
Cut only the approved material and depth. Do not extend a chase to make a fitting easier to place, cut brick units, or cut reinforcement unless the structural design specifically allows it. A mortar joint is not automatically non-structural. Stop and consult the engineer if you find unexpected reinforcement, a void, cracking, or a different wall build-up.
Install the raceway with listed fittings and secure it as required for its type. For EMT, NEC 358.30 generally requires support within 3 ft (900 mm) of each box, cabinet, or fitting, and at intervals no greater than 10 ft (3 m), subject to the section’s exceptions. Confirm the rules for the chosen raceway; those EMT limits do not apply to every type.
- Keep the raceway within the approved chase.
- Use the specified fittings and support method.
- Preserve accessible boxes and planned pull points.
- Do not close the wall until required inspections are complete.
Verification: Inspection, Testing, and Compatible Reinstatement
Verification confirms that the wiring method, supports, connections, and finished route meet the approved plan and local requirements. Arrange inspection while the work is still visible if required. After approval, test the completed circuit, document the hidden route, and restore the masonry with compatible materials without covering boxes or interfering with fittings.
The authority having jurisdiction determines permit and inspection requirements. Ask whether the electrical and structural work need separate reviews, and at what stage an inspector must see the open chase. Keep permits, approvals, inspection results, product information, and photographs with the home’s records. These details help future owners or tradespeople avoid cutting into the concealed route.
Test and restore without hiding defects
Before patching, check that conductors are undamaged, terminations are complete, and the route is clear of debris. Have the electrician perform the required tests for the circuit and equipment. Do not energize unfinished or uninspected work when local rules require inspection first.
Use patching materials compatible with the existing masonry and finish. The repair should not bridge or conceal a required access point, cover a fitting, or prevent a box cover from opening. Photograph the open chase with a tape measure or other scale, and note the route from fixed points such as corners and floor level.
Installation Scenarios: What Changes the Plan?
These examples show how different wall conditions affect the decision. They are illustrative scenarios, not reports of inspected projects or a substitute for site review. In each case, the key step is to confirm the wall and route before cutting. A similar-looking wall can have a different structure, reinforcement, or code status.
| Scenario | Main concern | Sensible next step |
|---|---|---|
| Interior brick wall with a proposed vertical route | Structural role and hidden services | Survey both sides and obtain written chase limits |
| Exterior brick wall | Moisture, corrosion, and weather exposure | Select a raceway and fittings listed for the conditions |
| Wall with reinforcement or an uncertain build-up | Cutting may affect structural capacity | Stop; have the engineer define an acceptable route |
| TV power and signal cables together | Different wiring and separation rules | Plan compliant, separate pathways as required |
| Existing splice box on the route | Box access after finishing | Relocate or rework it so it remains accessible |
A common decision point is whether to chase at all. If the engineer will not approve a route, or the route would cross reinforcement, consider a surface raceway, a carefully placed cabinet or conduit cover, or another approved path. These options may be more visible, but they avoid unapproved removal of masonry.
Conclusion: Make the Route Safe, Serviceable, and Documented
A hidden cable route is successful only if it preserves the wall, uses an approved wiring method, and remains serviceable. The most reliable sequence is survey, written structural approval, electrical planning, controlled installation, inspection, testing, and careful reinstatement. Do not trade structural safety or box access for a seamless finish.
Before work starts, confirm the locally adopted codes, the engineer’s approved chase limits, raceway fill, box access, and inspection steps. If any of those are unclear, pause and ask the relevant professional or authority. A surface route is preferable to a concealed route that cannot be approved.
FAQ: Chasing Brick Walls for Wiring
These answers cover the decisions homeowners most often face when planning a concealed route through brick or mortar. Local code, wall design, and site conditions control the final answer, so use the responses as planning guidance and confirm project details with the authority having jurisdiction and qualified professionals.
Can I chase only the mortar joint?
Not automatically. Mortar is part of the masonry system, and a deep or continuous cut may reduce wall capacity. Get written structural approval for the exact route and limits.
Is there a standard safe chase depth?
No universal depth is safe for every brick wall. The limit depends on wall type, loading, reinforcement, location, and structural design.
Can I bury a cable directly in the chase?
Do not assume so. Use a wiring method listed for the location and installation. Mortar alone is not an approved protective wiring method.
Can I hide a TV’s power cord in the wall?
Do not conceal an appliance cord or extension cord inside a wall. Ask an electrician about installing a compliant receptacle or other approved wiring method.
Can power and HDMI cables share one raceway?
Do not assume they can. Electrical separation rules apply. Plan separate pathways unless a code-permitted method allows the proposed arrangement.
Do junction boxes need to stay accessible?
Yes. NEC 314.29 requires boxes to remain accessible without removing building structure or finish. Never bury a splice box behind the patch.
How do I calculate raceway fill?
Use the applicable NEC Chapter 9 raceway and conductor tables. Table 1 gives general fill limits of 53% for one conductor, 31% for two, and 40% for more than two.
Does EMT need support inside the chase?
NEC 358.30 generally sets EMT support within 3 ft of boxes and no more than 10 ft apart, subject to exceptions. Confirm the adopted code and the requirements for the raceway used.
Should I hire a structural engineer?
Get structural review before cutting when the proposed chase affects masonry. The engineer should approve the route and material-removal limits in writing.
When should I patch the wall?
After required open-work inspections, installation checks, and testing are complete. Document the route first, then patch with compatible materials without covering boxes or fittings.
(This article was written by one of our staff writers, Michael Holloway. Visit our Meet the Team page.)