How To Hide Pipes Under Floating Vanity (5+ Ways Explained)

To conceal pipes under a floating vanity, consider using a pipe cover made of plastic, wood, or resin that matches your vanity’s style or creating an under-vanity cabinet with shelves or drawers for storage. Utilizing baskets or storage bins, installing decorative panels on the vanity’s sides, or attaching a fabric skirt around the bottom are also effective ways to hide the pipes while adding a decorative touch. Ensure the chosen solution maintains pipe accessibility and functionality without compromising their integrity.

Installing a floating vanity can be an incredibly satisfying and rewarding DIY project.

It not only improves the look of a bathroom, but it also provides valuable additional storage space.

However, one of the major challenges of installing a floating vanity is how to hide the pipes that run along the wall.

Fortunately, with the right materials and a few simple steps, the pipes can be easily concealed, creating a sleek, modern bathroom aesthetic.

Following the right steps, you can easily and effectively conceal unsightly pipes.

First, you’ll need to gather the necessary materials: a jigsaw, a level, a drill, screws, a stud finder, a reciprocating saw, shims, and pipe insulation.

Using these materials, you can create a false wall section behind the vanity, allowing for the pipes to be tucked away.

With the false wall in place, you can attach the vanity to the wall, finish up your project, and have a beautiful, professional looking bathroom.

How To Hide Pipes Under Floating Vanity

Measure the Pipes

Carefully measuring the length of the pipes, they must be placed in ideal positions to ensure they can reach their destination while avoiding any obstructions. Secured firmly in place, the pipes will be in the perfect position for successful installation.

Determine the length and position of the pipes

Having laid out the plan, the next step is to determine the length and position of the pipes. This requires measuring the area and accounting for any irregularities in the space. One of the most important components of this process is to ensure that the pipes are cut to the correct size, as this can have a major impact on the overall efficiency of the system.

Accurate measurements are imperative, so it is important to take a few extra moments to ensure that all the measurements are correct. Using a ruler, tape measure, and level, the length and position of the pipes should be determined. It is also important to measure the walls and flooring to ensure that the pipes are installed in the correct location. Finally, it is important to note any obstructions that may be present in the area, such as walls, furniture, or other items that may interfere with the positioning of the pipes.

Once the measurements have been taken, the pipes can be cut to the proper length. This is an important step, as it ensures that the pipes fit properly and do not require additional modifications. Careful attention should be paid to the measurements to ensure that the pipes are cut to the correct size and that any obstructions are taken into account. This helps to ensure that the pipes are installed correctly and that the system functions as efficiently and effectively as possible.

Take into account any obstructions

Armed with the measurements of the length and position of the pipes, the next step was to take any potential obstructions into account. This was especially important when dealing with the pipes in the walls, since any interference could cause serious problems for the project.

It was essential to ensure that there were no electrical cables, gas lines, or other structures behind the wall that could be affected by the installation. To do so, the team used specialized devices such as x-ray machines to detect any potential obstructions. This allowed them to make sure that the pipes were positioned correctly and that they would not interfere with other objects.

In addition, the team also had to take into account the age of the building and any potential wear and tear that could cause damage to the pipes. To prepare for this, they took extra precautionary measures such as reinforcing the pipes with steel braces and lining the walls with insulation. This ensured that the pipes would stay secure and not be subject to any unforeseen harm.

Secure the Pipes in Place

With the length and position of the pipes determined and any potential obstructions taken into account, the next step is to secure the pipes in place. The most important part of this process is making sure the pipes are secured tightly and securely. This is crucial for ensuring that there are no water leaks or other potential issues as a result of any pipes not being firmly in place.

To secure the pipes in place, the first step is to measure and mark the wall or other surface to indicate where the pipes should be placed. It is important to double check the measurements to make sure they are correct. After the measurements have been checked, the next step is to drill holes in the wall or other surface and insert the appropriate mounting brackets. This will ensure that the pipes are in the correct position and held securely in place.

Finally, the pipes can be placed in the mounting brackets and a wrench or socket wrench can be used to tighten the nuts and bolts. This will ensure that the pipes are securely in place. It is also important to check the pipes periodically to make sure that they remain firmly in place and that there are no leaks. With the pipes securely in place, the final step is to connect the pipes to the appropriate outlets and begin the process of testing the system.

Prep the Wall

The wall must be prepped prior to any new drywall installation. This includes removing any existing drywall, patching any holes, and sanding down any rough edges. Firstly, any old drywall must be carefully taken out and disposed of, creating a fresh canvas for the new drywall. Secondly, any holes must be filled in with matching joint compound to create a seamless look. Finally, any rough edges must be sanded down to create a smooth finish.

Remove any existing drywall

Now that you have measured the area you will be adding pipes to, it is time to prepare the wall for the project. The first step is to remove any existing drywall. To do this, you will need a hammer and a pry bar. Start by using the hammer to create a hole in the drywall. Insert the pry bar into the hole and use it to create a larger opening in the drywall. Once the hole is wide enough, use the pry bar to pull the drywall away from the wall. This should be done slowly and carefully to prevent any damage to the wall. As you remove the drywall, you should be able to see the wooden beams behind the wall. Next, inspect the beams to make sure they are not cracked or damaged in any way. If any of the beams are damaged, make sure to replace them before continuing with the project. Finally, remove any nails left behind from the drywall and discard them. By taking the time to properly remove the drywall, you will ensure that the project will go smoothly and you will have a great end result.

Patch any holes

Having finished measuring the pipes for the plumbing project, it is time to start preparing the wall. This includes removing any existing drywall, patching any holes, and sanding down any rough edges.

Beginning with patching any holes, the first step is to identify which holes need to be patched. To do this, a flashlight can be used to scan the walls and expose any holes that may not be visible to the naked eye. After the holes have been identified, a patching compound should be applied to the hole and smoothed out. For larger holes, a wall patch should be used to cover the hole. It is important to make sure that the patch is flush with the wall by using a putty knife to press it into place. For smaller holes, a spackling compound should be used and smoothed out with a putty knife. Once the patch or spackling compound has been applied and smoothed, it should be left to dry completely before moving on to the next step.

Patching any holes is an important part of preparing the wall for the plumbing project. With the holes patched, the wall will be ready for the next step: sanding down any rough edges.

Sand down any rough edges

With the pipes successfully measured, it was time to move on to the next step – prepping the wall. This would involve removing any existing drywall, patching any holes, and sanding down any rough edges.

Sanding down any rough edges was the most important part of the prep process. The wall needed to be completely smooth so that the new drywall could be installed without any bumps or ridges. To accomplish this, a sanding machine was used. It had a powerful motor and was equipped with a flexible head, which allowed it to reach into corners and around curved surfaces.

The machine was operated by a professional drywaller who had years of experience. He knew exactly how to adjust the speed and pressure of the machine to ensure a perfect finish. After the dry waller had made a few passes, the wall was completely smooth and ready for the installation of the new drywall.

Cover the Pipes

The next step is to use a flexible conduit pipe to cover the pipes. Securely attach the conduit pipe to the wall with screws to ensure a secure fit. Finally, cut the cover to fit the length of the pipe, and be sure to use a sharp blade for precision cutting.

Use a flexible conduit pipe

Having prepped the wall, it is now time to use a flexible conduit pipe for the project. Flexible conduit pipes are ideal for situations in which the conduit needs to be bent or shaped to fit the space. They come in a variety of sizes, so the project’s specific needs can be met.

When using a flexible conduit pipe, it is important to inspect the pipe for any defects. If there is any visible damage, the pipe should not be used. The pipe should be fit with the proper connectors to ensure that the pipe will remain secure. To get a snug fit, the connectors should be tightened with a wrench or pliers. Once the pipe is properly connected, the pipe should be tested to make sure it is securely attached and not loose.

The flexible conduit pipe should be affixed to the wall with screws or anchors. Depending on the size of the pipe, multiple screws or anchors may be needed to secure the pipe. It is important to make sure that the screws are tightened properly. Once the pipe is securely affixed to the wall, the next step is to cut the cover to fit.

Secure the conduit pipe to the wall

Now it’s time to secure the conduit pipe to the wall. Drill pilot holes into the wall and use wall anchors to ensure the pipe is secure and ready for covering. It’s important to use the right materials for the job. Using the wrong materials could cause the pipe to become loose and create a hazardous situation. Drill the holes around the perimeter of the pipe and then insert the wall anchors. Double-check that the anchors are securely fastened before moving on.

Cutting the Cover to Fit

Having prepped the wall, the next step is to cut the cover to fit the flexible conduit pipe. An important part of this process is to measure the length of the conduit pipe and then mark it on the back of the cover. It is important to make sure that the measurements are accurate and the marks are clear.

Using a ruler or measuring tape for this step is essential to ensure the cover is cut to the right size. Once the marks are made on the cover, a hacksaw or a fine-toothed saw can be used to cut along the lines. For a cleaner finish, a jigsaw or a sharp craft knife can be used.

After the cover has been cut to size, it should be tested to make sure it fits properly. This can be done by sliding the cover over the conduit pipe and then checking that the cover is tight all the way around. If there are any gaps or spaces between the cover and the pipe, adjustments may need to be made. Once the cover fits snugly over the conduit pipe, it is ready to be secured to the wall.

Install the Floating Vanity

Carefully maneuvering the vanity onto the wall, it’s necessary to ensure it is level and securely fastened. With precision, pipes must be cut to the perfect size to fit the vanity’s frame. Finally, the vanity is ready for installation.

Place the vanity on the wall

After connecting the plumbing, the next step is to take the floating vanity and place it on the wall. The first step is to make sure that the vanity is level and to make sure that it will stay securely in place. Therefore, it is important to make sure that the mounting hardware is secure. Before drilling any holes, measure the area carefully and make sure that the measurements are correct.

Drill the holes and place the mounting hardware accordingly. Be sure to use the right size drill bit for the type of wall that you are working with. If possible, use wall anchors to make sure the vanity is secure. Once that is done, it is time to lift the vanity onto the wall. Place it on the wall gently, checking to make sure that it is level. When it is in the desired position, mark the wall accordingly.

Use a level to make sure that the vanity is level and that it is in the correct position. If it is not level, adjust the mounting hardware until it is. When the vanity is secure, use a drill to make sure it is properly secured to the wall. If the vanity is too heavy to lift, use a hand truck to make sure it is safely secured on the wall. Once it is secure and level, it is time to cut the pipes to fit the vanity.

Make sure it’s level and secure

After the pipes were covered, it was time to install the floating vanity. The first step was to place it on the wall. The vanity was carefully lifted and held securely in place by two people, making sure it was level.

To ensure the vanity was level, a leveler was used. This tool was placed across the top of the vanity, and the bubble was watched carefully. If the bubble was not in the center, the vanity was adjusted until it was.

Once the vanity was determined to be level, it was secured in place with screws. The screws were inserted at the top of the vanity and then tightened until the vanity was secure. Each screw was checked to make sure it was tight. With each successful check, the vanity was becoming more and more secure.

Once the vanity was properly level and secure, it was time to cut the pipes to fit.

Cut pipes to fit

Transforming a bathroom space with a floating vanity requires precise measurements and skillful maneuvers to ensure a successful installation. After the pipes have been connected, the next step is to cut the pipes to fit.

Before starting the cutting process, double check the measurements of the wall space and the vanity being installed. Measure twice, cut once, to make sure the vanity fits securely against the wall. If the measurements are off, it can be difficult to compensate for the error after the cutting is complete.

Once the vanity is in place, it’s important to make sure the pipes are cut to the exact size. This requires the use of a pipe cutter, which is a tool specifically designed to provide a clean cut through a variety of pipe sizes and materials. It is equipped with a blade that slowly tightens around the pipe until it cuts through. Have a pair of gloves and safety glasses handy to protect the hands and eyes. After the cut is complete, smooth out any burrs or sharp edges with a piece of sandpaper.

Cutting the pipes to fit is an important part of the installation process. With the correct measurements and the right tools, the pipes will fit perfectly and the vanity will be secure against the wall.

Install the Faucet

To begin installation of the faucet, measure and drill holes for the base. Attach the faucet to the water supply with the necessary hardware. Lastly, cut the supply pipes to the desired length for connection.

Measure and drill the holes

Having completed the installation of the Floating Vanity, it is time to move on to the next step: Installation of the Faucet. The first task is to measure and drill the holes that will be required for the faucet.

This is a straightforward process and requires careful measurement. Using a tape measure, measure the distance between the two holes on the top of the vanity and mark the corresponding spots on the sink deck. After the locations have been marked, use a drill to cut two holes of the appropriate size. It is important to use the drill that is correct for the material of the sink deck.

Once the holes have been cut, carefully remove any excess material and check the fit of the faucet. Make sure the faucet is securely held in place by the holes and that it sits flush against the sink deck. If there are any issues, adjust the holes accordingly until the faucet fits properly. Once the faucet is in place, the next step is to connect it to the water supply.

Connect the faucet to the water supply

Having secured the vanity in place, the next step is to connect the faucet to the water supply. Carefully measure and mark the location for the supply pipes and the faucet. With the measurements marked, use a drill bit to create the holes in the sink. It’s important to use a drill bit that is the exact size of the pipes and faucet to ensure a snug fit.

With the holes drilled, place the faucet into the marked holes. Before fastening the nuts, make sure the faucet is angled in the correct direction. With the faucet in the correct position, use a wrench to tighten the nuts. With the faucet secured, connect the supply pipes to the faucet. If necessary, use a pipe cutter to trim the pipes to the desired length.

Once the supply pipes are cut to size, connect the pipes to the faucet. Ensure that the connections are tightly secured and use plumber’s putty to provide extra sealing where needed. After the connections are secure, turn on the water supply and inspect for any leaks. If there are any leaks, ensure that all connections are tightened and the putty is applied correctly. With the faucet successfully connected to the water supply, the project is complete!

Cut Supply Pipes

After the holes for the faucet have been measured and drilled, it’s time to cut the supply pipes. To begin, make sure to gather all the necessary tools and materials, including a pipe cutter, a measuring tape, a marker, and the appropriate pipes.

Start by measuring the length of the supply pipes according to the measurements of the vanity. Mark the pipes with a marker where you need to make the cuts. Before cutting the pipes, make sure to double check the measurements to ensure accuracy.

Once the cuts are marked, use a pipe cutter to cut through the pipes. As you cut, make sure to keep the pipe steady to prevent it from vibrating or moving. When the cut is complete, use a cloth to clean off the newly cut edges and remove any metal filings or pieces. With the pipes now cut, you are ready to connect the faucet to the water supply.

Add the Countertop

A tape measure was used to make sure the countertop fit the vanity perfectly. Secure it in place with several screws to ensure it remains in place for years to come. Finally, apply adhesive along the edges to ensure a solid seal.

Measure the countertop

After ensuring the faucet was installed correctly, the next step is to measure the countertop. It’s important to get the right measurements to make sure the countertop fits the vanity perfectly.

A tape measure should be used to measure the length and width of the vanity. A good rule of thumb is to measure twice and write down the measurements. Having the correct measurements is essential for ordering the correct countertop size.

It’s also important to measure the cutouts for the sink and the faucet. Using a ruler, measure the distance from the edge of the vanity to the center of the cutouts. This will provide the right information for ordering a countertop that fits the vanity perfectly. Additionally, if the countertop has any large curves or angled edges, it’s essential to measure those as well. Taking the time to get accurate measurements will ensure the countertop fits the vanity perfectly.

Secure it to the vanity

Once you have measured your countertop for a perfect fit, it’s time to secure it to the vanity. It’s important to make sure that your countertop is firmly attached to the vanity, so you’ll want to use an adhesive that is designed for this type of job. Before you begin, make sure to clean the surface of both the vanity and the countertop to ensure a strong bond. Use a mild detergent and a damp cloth to remove any dirt or debris. After the surfaces are dry, you can start applying the adhesive.

Begin by applying a thin line of adhesive along the edge of the vanity, making sure to get into all of the corners. Once the adhesive is in place, carefully lower the countertop onto the vanity. As you’re lowering the countertop onto the vanity, you’ll want to press down firmly on the edges to ensure that the adhesive makes a good connection. Once the countertop is in place, you can use a rubber mallet to make sure the two pieces are securely attached. Finally, you’ll want to place something heavy on top of the countertop, like a large book, to allow the adhesive to set.

Adhesive

Now, the last step before you can start to enjoy your new bathroom is to adhere the countertop to the vanity. Adhesive is the best way to securely attach the countertop to the vanity and keep it from slipping or coming apart.

When choosing an adhesive, make sure it is approved for use in bathroom and kitchen applications. This type of adhesive is designed to resist moisture, so it is the best choice for this project. Most adhesives come in a tube or a bucket and are applied with a caulking gun.

Before you apply the adhesive, be sure to clean the area of the vanity and countertop where the adhesive will be applied. This will help the adhesive bond better and create a longer lasting seal. Make sure to apply the adhesive in a thin layer, as too much will create a mess and be difficult to clean up. Once the adhesive is applied, press the countertop onto the vanity and hold for at least 30 seconds. This will help the adhesive bond and secure the countertop into place.

Connect the Sink

Flush against the countertop, the sink is carefully affixed with a bead of silicone caulk. Next, the water supply lines are connected to the valves beneath the basin. Finally, the pipes are secured using a specialized wrench, creating a watertight seal.

Attach the sink to the countertop

With a few final steps, your sink is almost ready to be used! Attaching the sink to the countertop is the first step. Start by placing the sink upside down on the countertop. Use a ruler to measure the distance between the holes you drilled in the countertop and the holes in the sink. Make sure that the measurements are equal.

Next, take the mounting brackets and carefully attach them to the countertop using screws. Be sure to use the correct size of screws for the bracket. Measure the distance between the brackets and make sure that it matches the sink you are using.

Finally, take the sink and place it on top of the mounting brackets. Line it up with the holes in the countertop and the brackets. Make sure that the sink is securely fastened to the countertop using the appropriate screws. Once the sink is securely attached, you are ready to move on to the next step: connecting the sink to the water supply.

Connect the sink to the water supply

After attaching the sink to the countertop, it is time to connect the sink to the water supply. This is an important step as it helps ensure that the sink is properly connected and functioning as expected. First, take a look under the sink and identify the water supply lines. You will need to connect the hot and cold water lines to the shutoff valves. To do this, you will need a wrench and some thread tape. Begin by wrapping the threads of the shutoff valves with thread tape. Make sure to wrap the tape in a clockwise direction. Then, use the wrench to tighten the connections. You will know that the connections are secure when they are tight and there are no leaks. Finally, turn on the water supply and check to ensure that there are no leaks.

Securing the Pipes

Once the sink is attached to the countertop and connected to the water supply, it’s time to secure the pipes. This is an important step. Loose pipes can lead to leaky faucets and water damage. First, gather the necessary supplies, such as pipe clamps, a hacksaw, pipe sealant, and a power drill.

Next, measure the pipes and mark the spots where the clamps will be placed. Cut the pipes to the appropriate length with the hacksaw. Apply the sealant to the cut ends of the pipes and then place the clamps around them. Secure the clamps with the power drill and screws.

Finally, turn on the faucet to check that the connections are tight and secure. If there are any leaks, tighten the clamps and add more sealant. With the pipes secured, your sink is now ready to use.

Finish the Installation

Carefully sliding the finishings in place, the vanity handles were secured with screws to complete the look. Glinting in the light, the mirror was then fitted to the wall, with any additional decorations surrounding it for a polished effect. With the sink resting in its designated spot, the installation was complete.

Install the vanity handles

Armed with the sink properly connected, it is now time to finish up the installation with vanity handles. Installing these handles requires two steps. First, mark the position of the handles on the vanity. When doing this, it is important to make sure that the handles are placed equidistant from the sink and aligned in the same direction. Next, use the hardware provided to attach the handles to the vanity. Depending on the type of hardware being used, the installation process can take anywhere from a few minutes to several hours. Patience is key, as it is essential that the handles are securely attached to the vanity and that the alignment is perfect.

Add the mirror and any other decorations

To finish off the installation, it’s time to add the mirror and any other decorations. A mirror is an essential component for any vanity, as it helps to open up the space and make it look larger. Plus, it adds a touch of style to the bathroom. Make sure to choose a mirror with the right size and shape for the vanity. Additionally, any other decorations, such as a towel rack or shelf, should be installed now. Depending on the size of the vanity, there may not be much extra room for decorations, so make sure to choose pieces that won’t overwhelm the space. These decorations can help to complete the look of the vanity and add a touch of personality.

Fit sink

Now that the sink is connected, it is time to fit it securely in place. Carefully lower the sink into the vanity countertop, and be sure to line up the holes for the drain and faucet. After positioning the sink correctly, use the included sink clips to secure it in place. Tighten the clips until the sink is snug, but be careful not to overtighten them as this may crack the porcelain.

Next, take the included caulk and apply it to the edges of the sink to form a waterproof seal. Make sure that the caulk is sealed all the way around the sink, and pay special attention to the area where the sink and countertop meet. This will ensure that no water can get underneath the sink. Once the caulk is dry, you can enjoy your new sink.

Conclusion

Installing a floating vanity can be a great way to give your bathroom a modern look. All it takes is a few easy steps to make your pipes disappear beneath your new vanity. With the right materials and tools, you can have your vanity installed and connected in no time. The process may seem intimidating at first, but the satisfaction of a job well done makes all the difference. With a little patience and effort, your bathroom can be transformed into a sleek and modern oasis.